Building Regulations Approval in England, Explained
On October 1, 2026 by BobFrom time to time, anyone wishing to construct a building in England will encounter the Building Regulations. Often confused with planning permission, the two sets of requirements are entirely separate and understanding the Regulations is helpful, particularly in avoiding unwelcome surprises on site.
What the Building Regulations cover
The Building Regulations are concerned with the minimum standards for the design and construction of buildings. These include such matters as whether a building is stable, safe and healthy, and accessible to all, and whether it provides adequate drainage and ventilation, and the efficient use of energy. These are addressed in a numbered part and supported by approved documents that provide practical guidance on how the requirements may be met.
Approved documents are provided for each part of the Building Regulations and may be referred to as the ‘routes’ to compliance. A designer is, however, free to adopt other solutions to meet the requirements as long as they are able to demonstrate that the requirements have, in fact, been met. It is common practice for designers to use the approved documents as the route to compliance as, in the main, these provide a clear and understood pathway to compliance.
Difference between Planning Permission and Building Regulations
Planning permission is concerned with issues of land use and the effect of development on the surrounding area, e.g. size and proximity to neighbours. Building Regulations relate to the internal layout of a building and how the building is constructed in order to ensure it is safe and healthy to use. It is possible for a building to be granted planning permission and for Building Regulations approval not to be required, or for a building to be granted Building Regulations approval and for planning permission not to be required.
What Work is Covered
There are a number of building works that are governed by the building regulations, some of which are; the construction of new buildings, extensions and modifications to existing buildings, new or altered drainage and central heating and hot water systems and ventilation. Certain building works, for example some domestic electrical works, have their own requirements and some work may be undertaken by a competent person. Exempt work includes some minor building works. Often it is not easy to identify whether work is exempt from building regulations, therefore it is good practice to check with the local building control body.
The Two Routes to Approval
In England, there are two routes towards building control approval. The first is through the local authority building control service. The second route is through a registered approved inspector, now more commonly known as a registered building control approver. Both can examine construction drawings and building plans, carry out inspections and issue the final approval. Owners and developers are free to choose the route that is most appropriate for their project, and the same route must be followed for the project from start to finish, unless formally replaced.
Full Plans and Building Notice
When making a submission as part of a local authority application, there are usually two options. The first is to submit detailed designs and specifications and request a check prior to work beginning (a full plans application). Upon receiving the check, the authority issues a decision, which provides a record of what has been accepted. The second option is to simply notify the authority of work about to commence (a building notice). This option is usually employed for small and uncomplicated work, and places greater onus on the builder to get things correct as the work progresses. There are also other restrictions on the types of building for which a building notice can be used.
Higher risk buildings are subject to a separate and more onerous regime, and people working on these should seek specific guidance.
What Happens During Construction
Approval does not end with a stamp on drawings. Building control officers/inspectors have to be satisfied that the work being carried out agrees with what was approved, and usually visit at key stages of construction to check this. The general stages of construction that are usually checked include the beginning, excavation of the foundations, concreting, the placing of the damp-proof course, and the installation of the drainage and structural elements and completion of the work. Notification at the right stages is important because work covered over may have to be uncovered for inspection. Keeping drawings on site, notifying changes, and asking questions normally prevents disputes.
Completion Certificates
When the conditions of a completion notice have been satisfied, the issuing authority will generally provide a completion certificate. These should be retained, as they will be required when the property is sold or when seeking related approvals. The absence of a completion certificate will lead to delays.
Working with Designers and Contractors
The requirements of the building regulations are complied with by the collaborative efforts of all project participants and should be addressed as part of the design and construction process. Where the client understands their responsibilities at the start of the process, it facilitates compliance with the building regulations.
A Reasonable Approach
The Building Regulations 2010 should be considered as setting minimum standards for building safety, health and wellness. Early involvement of the building control authority, combined with the use of building control as part of the design and construction process and the judicious use of inspections, will help satisfy the Building Regulations. Those in doubt as to the applicability of the Building Regulations to a particular project should consult the most up to date building regulations or a chartered building professional.
Archives
- October 2026
- June 2026
- May 2026
- April 2026
- March 2026
- October 2025
- August 2025
- July 2025
- June 2025
- May 2025
- December 2024
- November 2024
- October 2024
- July 2024
- April 2024
- March 2024
- December 2023
- November 2023
- October 2023
- September 2023
- August 2023
- June 2023
- April 2023
- March 2023
- February 2023
- December 2022
- October 2022
- July 2022
- June 2022
- April 2022
- February 2022
- January 2022
- December 2021
- August 2021
- July 2021
- June 2021
- May 2021
- April 2021
- March 2021
- February 2021
- December 2020
- October 2020
- September 2020
- August 2020
- July 2020
- June 2020
- April 2020
- January 2020
- November 2019
- October 2019
- September 2019
- May 2019
- January 2019
- August 2018
- March 2018
- January 2018
- November 2017
- October 2017
- September 2017
- August 2017
- July 2017
- June 2017
- May 2017
- April 2017
- February 2017
- January 2017
- December 2016
- November 2016
- October 2016
- August 2016
- July 2016
- June 2016
- April 2016
- March 2016
- February 2016
- January 2016
- December 2015
- November 2015
- October 2015
- September 2015
- August 2015
- June 2015
- May 2015
- April 2015
- March 2015
- February 2015
- December 2014
- September 2014
- July 2014
- June 2014
- May 2014
- April 2014
- March 2014
- February 2014
- January 2014
- December 2013
- November 2013
- October 2013
- September 2013
- August 2013
- July 2013
- May 2013
- March 2013
- January 2013
- November 2012
- October 2012
- September 2012
- August 2012
- June 2012
Calendar
| M | T | W | T | F | S | S |
|---|---|---|---|---|---|---|
| 1 | 2 | 3 | 4 | |||
| 5 | 6 | 7 | 8 | 9 | 10 | 11 |
| 12 | 13 | 14 | 15 | 16 | 17 | 18 |
| 19 | 20 | 21 | 22 | 23 | 24 | 25 |
| 26 | 27 | 28 | 29 | 30 | 31 | |